Thomas Road at Tuthill (Acacia) Wash CFD Civil Roadway Improvements
This project consisted of a 1/2 mile of new roadway improvements including storm drain on Thomas Road located in the Verrado master planned community in Buckeye, AZ. A key scope item included the construction of a 15-cell cast in place reinforced concrete box culvert within the Tuthill (Acacia) Wash. The project also included 3,760 SYs of grading/paving, curb and gutter, sidewalk, signage, and striping. The project was completed on time and under budget while working in an active drainage wash during the summer monsoon season.