Alamar Phase 2 and 4 Infrastructure Improvements

Home Projects Alamar Phase 2 and 4 Infrastructure Improvements

Alamar Phase 2 and 4 Infrastructure Improvements

This multi-phased project included the realignment of El Mirage Road connecting into Broadway Road for a new community park. The existing El Mirage Road was removed and graded for future development. The other phase was a continuation of the Alamar community development connecting El Mirage Road to Dysart Road via the new Alamar Parkway. The scopes of work included undergrounding an existing irrigation ditch to 30” RGRCP, new 24” ductile iron pipe reclaimed waterline, 16” ductile iron pipe potable waterline, and ITS lines. The new utilities are for future residential development, new park complex, and high school. The new 4-lane divided roadway has a bike lane, landscaping, streetlights, and sidewalks on both sides.

Project Details

  • Location:

    Avondale, AZ

  • Owner:

    Brookfield Residential

  • Engineer:

    Land Development Engineering

  • Delivery Method:

    Design-Bid-Build

  • Value:

    $13M

  • Completed:

    8/2022

  • Market:

    • Private Sector