Thomas Road at Tuthill (Acacia) Wash CFD Civil Roadway Improvements

Home Projects Thomas Road at Tuthill (Acacia) Wash CFD Civil Roadway Improvements

Thomas Road at Tuthill (Acacia) Wash CFD Civil Roadway Improvements

This project consisted of a 1/2 mile of new roadway improvements including storm drain on Thomas Road located in the Verrado master planned community in Buckeye, AZ. A key scope item included the construction of a 15-cell cast in place reinforced concrete box culvert within the Tuthill (Acacia) WashThe project also included 3,760 SYs of grading/paving, curb and gutter, sidewalk, signage, and striping. The project was completed on time and under budget while working in an active drainage wash during the summer monsoon season.

Project Details

  • Location:

    Buckeye, AZ

  • Owner:

    DMB Associates

  • Engineer:

    Land Development Engineering

  • Delivery Method:

    Design-Bid-Build

  • Value:

    $2.2M

  • Completed:

    4/2023

  • Market:

    • Private Sector