Waddell Road Improvements
This high-profile section of Waddell Road, from the SR303 to Reems Road, was a 2-miles multi-phased reconstruction project. The scope of work consisted of 55,694 SYs (2 miles) of asphalt paving, 6,429 LF of 30” Maricopa Water District (MWD) irrigation relocation, new MWD manholes and delivery structures, street lighting, curb, sidewalk, fire hydrant relocation, traffic signals landscaping, striping, signage, 4/each reinforced concrete box culverts, striping, signage, and APS power conversion.