Verrado East District Phase 4
DCS was contracted as the general contractor to provide a turnkey approach for this 337-lot residential subdivision in the master planned community of Verrado. This project included over 23,000 LF of underground utilities including water, sewer, and dry utilities, over 31,000 SY of paving, signage, striping, street lights, as well as 2/each cast-in-place box culverts.